Quantity Take-off

Precise, item-wise quantities measured from your drawings for civil, structural, finishing and MEP works.

Overview

Quantity Take-off services

Every reliable budget starts with reliable quantities. Our quantity surveyors measure your project directly from the drawings, element by element, so you know exactly how much concrete, steel, masonry, finishing and services material the job really needs.

We work from architectural, structural and MEP drawings in PDF, DWG or hard-copy scans, and measure every item following IS 1200 modes of measurement (or the method your contract specifies). Each quantity is traceable back to the drawing, grid line and floor it came from, which makes checking and revision straightforward.

Whether you are a builder preparing a tender, a contractor checking a client's BOQ, or an owner who wants to know what the house will really consume, a clean take-off removes guesswork from purchasing, scheduling and cost control.

What's included

  • Earthwork – excavation, filling, disposal and anti-termite treatment
  • PCC, RCC by element – footings, columns, beams, slabs, staircases
  • Reinforcement steel quantities by diameter and member (BBS on request)
  • Shuttering / formwork areas by element type
  • Brick and block masonry, plastering, waterproofing
  • Flooring, tiling, painting, false ceiling and joinery
  • Plumbing, sanitary, electrical and drainage quantities
  • External development – roads, paving, compound wall, landscaping

How we work

  1. Drawing Review

    We check that drawings are complete and list any missing details or clarifications before measuring.

  2. Measurement

    Item-wise take-off by floor and element using CAD tools and structured measurement sheets.

  3. Abstract

    Measurements are rolled into a clean abstract of quantities grouped by trade.

  4. Quality Check

    A second surveyor cross-checks key items and totals against benchmarks.

  5. Delivery

    You receive editable Excel sheets and a PDF set, with a walkthrough call if needed.

Deliverables

DeliverableFormat
Detailed measurement sheetsExcel
Abstract of quantitiesExcel + PDF
Marked-up drawingsPDF
Bar bending schedule (optional)Excel

Benefits

Fewer surprises on site

Order the right material quantities and avoid shortages or wastage.

Faster tendering

Bid confidently with quantities you can defend.

Easy revisions

Traceable sheets mean design changes can be re-measured quickly.

Frequently asked questions

At minimum, architectural plans, sections and elevations. For full structural and services quantities we also need structural and MEP drawings. We will tell you if anything is missing.

Ready to start your Quantity Take-off?

Share your drawings and get a clear scope, fee and timeline within one working day.